The expansion of the existing Sines LNG terminal, increased gas storage capacity, vaporisation throughput, transport capacity and improved system reliability.
For this purpose, and due to the increase in this capacity, a new system of collection (of seawater), supply and discharge was planned, which includes the installation of two more steamers (in addition to the current five), as well as the long-term plan to add two more.
Location port of Sines, Setúbal, Portugal
Date: 2008-2011
Presupuesto: 4.146.543,92 €
Scope of the project: obras de captación y vertido para la ampliación del puerto