376 USM$
of budget
340 m
of lenght
Proes prepares several technical documents for river docking as part of the pre-bidding process for a new oil terminal in Iraq, on behalf of Habtoor Leighton.
"Firstly, a study of ship compatibility for the new terminal is conducted, including an analysis of geometric compatibility based on OCIMF (Oil Companies International Marine Forum) Mooring Equipment Guidelines in 2008. Additionally, a report on the dynamic behavior of moored vessels is conducted.
The design of the terminal's marine works includes a berthing front and loading and unloading platform for vessels, an access bridge between the platform and the marine facilities and, finally, these facilities formed by the waterfront together with the jetty office.
Location Khor Al Zubair, Irak
Date: 2014-2015
Scope of the project: pre-bidding phase