Logo Proes

Technical assistance for the bidding process of an oil terminal in Iraq

376 USM$

of budget

340 m

of lenght 

Proes prepares several technical documents for river docking as part of the pre-bidding process for a new oil terminal in Iraq, on behalf of Habtoor Leighton.

"Firstly, a study of ship compatibility for the new terminal is conducted, including an analysis of geometric compatibility based on OCIMF (Oil Companies International Marine Forum) Mooring Equipment Guidelines in 2008. Additionally, a report on the dynamic behavior of moored vessels is conducted.

The design of the terminal's marine works includes a berthing front and loading and unloading platform for vessels, an access bridge between the platform and the marine facilities and, finally, these facilities formed by the waterfront together with the jetty office.

 

Location Khor Al Zubair, Irak

Date: 2014-2015

Scope of the project: pre-bidding phase

Other projects

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

The port of Gijón, immersed in a project to extend its port facilities and reorganise its quays, is proposing to Repsol Butano the relocation of its quays.

2,000 m² surface area 12.5 million tonnes per year The Cemex company's facilities in the port of Tarragona are dedicated to reception, storage,