
1.500.000
m3 of dredging
The project consists of drawing up the work programme and work plan for the construction bidding process concerning the extension of the breakwater in the port of Aveiro.
The works consisted of the partial disassembling of the nose and its subsequent extension, as well as the enlargement of the navigation channel of the port.
The total volume of dredging for this navigation channel is in approximate terms of 1.5 million m³.
Location Aveiro, Portugal
Date: 2011
Scope of the project: technical documentation for the bidding of the breakwater for the port of Aveiro