Submarine outfall for the Nerja WWTP, Malaga

2.367,8 m

total lenght

The construction of an outfall is planned to discharge the effluents treated by the Nerja WWTP. At the same time, the sewage network will have three pumping stations equipped with spillways, which will only operate sporadically to evacuate any excess flow. Two of these spillways are also underwater pipelines that keep the discharge away from the coast.

In addition, two of the wastewater pumping stations have submarine spillways: the one at the Chíllar WWTP and the one at the Burriana WWTP.

Location Nerja, Málaga

Date: 2012

Scope of the project: design of the submarine outfall, including hydraulic sizing, grounding, bottom stability and auxiliary facilities

Significant data: the submarine outfall was designed in HDPE and has a total length of 2,367.8 m.

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station