Logo Proes

Huelva port channel utilization study

4.450 m

lenght 

290 m

width

The purpose of this project is to study the use of the channel of the port of Huelva, in the section between the mouth of the port and the last commercial dock located in the service area of the port, in order to determine which vessels of larger displacement could navigate through it, taking into consideration the variation in tidal height available.

An analysis of the existing terminals, as well as the dimensions of the vessels that will navigate the canal, is carried out, verifying them by means of ROM 3.1-99.

Location port of Huelva

Date: 2007-2011

Scope of the project: study of the maneuvers of access and departure of vessels to the port of Huelva and preparation of a draft, regarding the adaptation of the port's operating procedures.

Other projects

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

The port of Gijón, immersed in a project to extend its port facilities and reorganise its quays, is proposing to Repsol Butano the relocation of its quays.

2,000 m² surface area 12.5 million tonnes per year The Cemex company's facilities in the port of Tarragona are dedicated to reception, storage,