Logo Proes

Studies for new LNG vessel operation facilities in Guanabara, Brazil

10.000 m3/hour

LNG transfer capacity

14.000.000 m3/day

CNG emission capacity

The project aims to ensure the viability of a planned LNG terminal in Guanabara Bay, Brazil, and the adaptation of the port to it.

The work carried out by Proes includes: basic compatibility and design studies of the maritime terminal, propagation study, moored vessel study, technical specifications, manoeuvrability and risk study, compatibility software development, and technical assistance.

 

Location Guanabara Bay, Brazil

Date: 2007- 2011

Scope of the project: Feasibility studies

Other projects

Foto de Luis Fermín TURIEL PEREDO El 24 de julio de 2009 con la publicación en el Boletín Oficial de Cantabria -BOC- y el anuncio

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

The port of Gijón, immersed in a project to extend its port facilities and reorganise its quays, is proposing to Repsol Butano the relocation of its quays.