Connection gallery and reservoir of the drinking water treatment plant (DWTP) of Majadahonda, Madrid

60.000 m³

capacity

750.000 

population 

The purpose of the work is to draw up a construction project for a drinking water reservoir from the El Pardo junction and siphon.

Subsequently, in 2008, the construction project for the gallery inside which the outlet, inlet and relief pipes of the new reservoir will be connected to the respective pipes of the old one was drawn up. The gallery will be practicable and visitable at the levels corresponding to each pipe.

Location Majadahonda, Community of Madrid

Date: 2005-2008

Scope of the project: construction project for the construction of a drinking water reservoir and a gallery to connect to the existing reservoir.

Significant data: 60,000 m³ capacity for 750,000 inhabitants and maximum water level height of 7.80 m

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station