Feasibility report for new LNG terminal in Morocco

634.400.000 US$

Budget 

The scope of the work can be summarized in three aspects: characterization of the new LNG terminal, framework for its implementation, and analysis of the two possible locations, Jorf Lasfar and Nador West Med Port. A very preliminary conceptual design of the necessary infrastructure, including estimated timeframe and cost, is developed for both locations.

Foster Wheeler, in collaboration with Proes, suggests installing both the refinery and the LNG terminal in Jorf Lasfar and not using the connection to the GME (Maghreb-Europe Gas Pipeline).

Location Jorf Lasfar Port and Nador West Port, Morocco

Date: 2011

Scope of the project: study of location and implementation alternatives for an LNG terminal.

Other projects

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

El puerto de Gijón, inmerso en un proyecto de ampliación de sus instalaciones portuarias tratando de reorganizar sus muelles, propone a Repsol el traslado completo