Project for the adaptation of the existing WWTP and its expansion to accommodate the increased capacity required.
Low Voltage (LV) Power Supply from the existing substation at the station and complete electrical design: motor control panels, power circuits, I&C (Instrumentation and Control), external lighting, and grounding system.
Automation and Instrumentation & Control (I&C) Design.
Location Húmera, Madrid
Date: 2022
Scope of the project: adaptation and extension project, automation and instrumentation, and control