Logo Proes

Detailed engineering of the Wastewater Treatment Plant in Húmera, Madrid.

 

Project for the adaptation of the existing WWTP and its expansion to accommodate the increased capacity required.

Low Voltage (LV) Power Supply from the existing substation at the station and complete electrical design: motor control panels, power circuits, I&C (Instrumentation and Control), external lighting, and grounding system.

Automation and Instrumentation & Control (I&C) Design.

 

Location Húmera, Madrid

Date: 2022

Scope of the project: adaptation and extension project, automation and instrumentation, and control

Other projects

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station

The main objective of the present study is the hydrological and hydraulic analysis for the determination of the 500-year flood level of the river bed of

2,367.8 m total length In order to discharge the effluent treated by the Nerja WWTP, the construction of an outfall is planned. At the same time, the network