1.500.000 t
Liquefied LNG
Gazprom is promoting the project for the construction of a new LNG terminal in Portovaya, in the Baltic Sea.
The scope of the works to be carried out by Proes includes detailed engineering for the design of four caissons in 2017 and two more in 2018, as well as the necessary stability calculations, structural calculations, and technical specifications.
Location Portovaya, Leningradskaya Oblast, Russia
Date: 2017
Scope of the project: detail engineering, reinforced concrete caisson design, stability calculations, structural calculations, and technical specifications.
Significant data: the plant will liquefy 1.5 million tons of LNG from the nearby compression station at Portovaya, which is part of Gazprom's Nord Stream pipeline.