Structural inspection and assessment of a dock-dock in Salinetas, Gran Canaria

2.940.000 €

Budget 

50 years

old

The Disa hydrocarbon plant's dock-dock is at the end of its useful life and has certain pathologies that require a comprehensive rehabilitation project.

The work involved several phases, from the inspection and diagnosis of the pier structure to the definition of specific actions to repair the damage detected. The solution developed in the project comprises both the activities aimed at improving the stability of the structure with a system of jet-groutingThe project is aimed at reinforcing the breakwater with a blanket of blocks.

Location port of Salinetas, Gran Canaria

Date: 2014

Scope of the project: Inspection of the structure and analysis of pathologies. Evaluation of the structural condition of the dam and definition of the integral rehabilitation system.

Other projects

3.107.915 € PEM 450 m length The Mazares (or Manzanal) bridge, on the Esla river reservoir, was built in the 1930s.

The Somonte viaducts (both carriageways) are located on the A-8 motorway, and are included in a joint project of Proes and Fomento,

5.000 m2 superficie 3,0 x 6,7 m dimensiones dos muelles flotantes El cajón de la PLOCAN (Plataforma Oceánica de Canarias) se encuentra fondeado en el