1.284.852 m²
superficie del Plan Parcial
1 m
diámetro nominal de tuberúa H.A.
Proes has drawn up the Special Infrastructure Plan and will carry out the basic and detailed engineering of the works (storm tanks, pipelines and pumping station) for the Los Molinos - Buenavista Urban Development Consortium (Getafe).
"of a nominal diameter 630 mm PVC-U pipe, while the stormwater conduit consists of a nominal diameter 1000 mm H.A. pipe. The length of the wastewater collector is 781,83 meters, while the stormwater collector extends to a length of 3,633,33 meters.
Location Getafe, Madrid
Date: 2022-2023
Scope of the project: Special Infrastructure Plan, basic and detail engineering