Logo Proes

Construction project for ten bridges and viaducts and 25 walls in Bucaramanga, Colombia

880.000.000 €

Budget 

156 km

Length of the corridor

The project includes the construction of 10 bridges and viaducts, as well as 25 retaining walls, and is part of the Bucaramanga-Barrancabermeja-Yondó highway, which will enhance connections from the east to the country's most important oil production centers.

The project also includes rehabilitation activities, road improvement, and new construction to create a corridor of approximately 152 kilometers, of which 95 kilometers will have dual carriageways (two lanes in each direction). The infrastructure will feature two tunnels (5.96 kilometers in total) and 34 viaducts. This project will enhance traffic flow in the region, boost economic development opportunities, and stimulate employment.

Location Bucaramanga-Barrancabermeja-Yondó, Colombia

Date: 2015-2016

Scope of the project: Construction project

Other projects

27.046.000 € PEM 17,7 km length The Anillo Verde Ciclista de Madrid is a circuit whose objective is to connect several parks and green areas of

1.586.000 € PEM The work consists of doubling the access bridge to the industrial estate, separating incoming and outgoing traffic from the road.

295 m length The section of the Monforte del Cid-Aspe High Speed Line, in the province of Alicante, with a total length of 7,840 km.