Construction project of an intake for the Al Khafji desalination plant in the Kingdom of Saudi Arabia.

6.400

lenght (m) of pipeline

The seawater collection system for the Al Khafji desalination plant (Kingdom of Saudi Arabia) consists of a collection tower, installed on the seabed, leading the water through 6.4 km of 1600 mm GRP pipe to the pumping chamber.

The construction project defines both the underwater pipeline and the collection tower, and the procedures necessary for its installation, as well as the basic design and the calculations used for it.

Location Ras Al Khafji, Kingdom of Saudi Arabia

Date: 2011-2012

Scope of the project: constructive project

Significant data: The intake tower is at a 10-meter depth.

Other projects

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out