Logo Proes

Construction project for the Via al Mar 1 highway concession, Colombia

176 km

Lenght of the section

The works under the concession involve the improvement of the existing MAR1 highway in Antioquia and the construction of a second carriageway between the Occidente tunnel and Santa Fe de Antioquia.

The challenging topography of the area significantly influences the type of layout carried out, requiring the alignment to connect curves and counter-curves with minimal or near-minimum radii to closely follow the existing terrain morphology.

Location Antioquía, Colombia

Date: 2015-2016

Scope of the project: construction project: improvement of the current road and construction of a new one

Other projects

27.046.000 € PEM 17,7 km length The Anillo Verde Ciclista de Madrid is a circuit whose objective is to connect several parks and green areas of

1.586.000 € PEM The work consists of doubling the access bridge to the industrial estate, separating incoming and outgoing traffic from the road.

295 m length The section of the Monforte del Cid-Aspe High Speed Line, in the province of Alicante, with a total length of 7,840 km.