Remodelling of the access junction to the Tambre industrial complex, N-550 road, La Coruña

1.586.000 €

Budget 

The work consists of doubling the access bridge to the industrial estate, separating incoming and outgoing traffic from the ring road to Santiago de Compostela SC-20.l.

The standard section adopted consists of two separate carriageways. In the area of the junction over the N-550, the project envisaged two separate bridges: one existing at the time and the other newly built. The branches of the junction affected by the duplication were adjusted. The services affected (gas, water and sewerage pipes) by the works were also considered.

 

Location Santiago de Compostela, La Coruña

Date: 2006

Scope of the project: study of alternatives, basic project and construction project

Other projects

20,725.760 m platform 350 km/h V max This is the Consultancy and Technical Assistance for the Control of the Construction Project Works.

27.046.000 € PEM 17,7 km length The Anillo Verde Ciclista de Madrid is a circuit whose objective is to connect several parks and green areas of

53.350.000 € PEM 1.755 m length Arrazola viaduct The Atxondo-Abadiño section is 5,66 km long and runs entirely along the