
1.550 T
of weight
62 m
of lenght
This involves the supervision and approval of construction projects for a cable-stayed footbridge and an arch bridge in Ireland. The goal is to identify any issues that could pose a risk of accidents during construction, load testing of the structure, and throughout its operational life."
In the case of the Monastery Bridge, the arch bridge is located on the M-50 in this country. It is part of a bowstring scheme, with a 60-meter span and a 20-meter-width deck. The footbridge is one of a cable-stayed type."
Location Ireland
Date: 2006
Scope of the project: design of one bridge and supervision of the construction of another.