
The construction and development of an LNG reception and regasification plant are being proposed at the Port of Trieste, Zaule, Italy. The regasification plant requires a marine LNG unloading terminal where cargo transfer operations from the ships will take place.
As an integrated part of the overall project, Proes is responsible for the construction project related to the containment barrier for the proper fill material for the formation of the port area on reclaimed land. Additionally, Proes designed the water intake structure for the process water.
Location port of Trietre, Zaule, Italy
Date: 2010
Scope of the project: Construction project for the closing dike and containment wall, as well as the seawater intake structure, and the basic design of the mooring terminal and access bridge.