Logo Proes
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES

Maritime and river infrastructures

NATARBORA TIMOR GNL

Feasability study for the "Greater Sunrise" pipeline in Timor-Leste

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the

READ MORE »
PASARELA BBG BILBAO

Turnkey project for the adaptation of BBG's bow ship access ladder in Bilbao.

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

READ MORE »
AMPLIACION PUERTO ESTEPONA

Expansion of the port of Estepona, Malaga

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which

READ MORE »
1-muelle valencia

Extension of the Muelle de Levante in the port of Valencia

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out

READ MORE »
Procedimiento de evaluación probabilístico de la energía de impacto de buques en las márgenes del río Támesis, Londres

Evaluación probabilística de la energía de impacto de buques en las márgenes del río Támesis, Londres

The main objective of the project is the probabilistic assessment of the impact energy of ships on temporary structures located along the margins.

READ MORE »
tenerife

Project for the new public container terminal in Santa Cruz de Tenerife

8.9 M€ Budget 152,804 m² surface area excluding the manoeuvring area The project defines the adaptation works for the concession of the occupation of the

READ MORE »
ibiza

Dique de abrigo de la bocana de entrada al puerto de Ibiza, Baleares

3.78 M€ PEM, 109.5 meters vertical breakwater height. The construction project aims to define the necessary actions for the design and construction works.

READ MORE »
PERSPECTIVA-03 >san andres malaga

Upgrading of the dock and outer harbour of San Andrés, port of Málaga

11,39 M€ Budget  -16,5 m dredging in the basin n9. The project involves the development and improvement of the outer basin of the Port of Málaga.

READ MORE »
CadizTerminal-e1593686956359

New container terminal in the port of Cadiz Bay

73.023.880 € Budget 575 meters quay length. Due to the anticipated increase in container traffic expected for the bay port of...

READ MORE »
Escombreras

Proyecto de construcción de una terminal BB/TT en la dársena de Escombreras, Cartagena, Murcia

12,26 M€ PEM  25.000 – 315.000 TPM tamaño petroleros El proyecto consiste en la construcción de un nuevo pantalán, dotado con dos nuevos frentes de

READ MORE »

Home

Calle Virgilio, 2, edificio 3
28223 Pozuelo de Alarcón, Madrid

913 454 565

  • Disclaimer
  • Privacy policy
  • Cookies Policy
  • Management policies
  • Complaints channel

© Proes 2025. All rights reserved