2.940.000 €
Budget
50 years
old
The Disa hydrocarbon plant's dock-dock is at the end of its useful life and has certain pathologies that require a comprehensive rehabilitation project.
The work involved several phases, from the inspection and diagnosis of the pier structure to the definition of specific actions to repair the damage detected. The solution developed in the project comprises both the activities aimed at improving the stability of the structure with a system of jet-groutingThe project is aimed at reinforcing the breakwater with a blanket of blocks.
Location port of Salinetas, Gran Canaria
Date: 2014
Scope of the project: Inspection of the structure and analysis of pathologies. Evaluation of the structural condition of the dam and definition of the integral rehabilitation system.