
2.000.000.000 US$
Budget
The project consists of the redevelopment of an 8-mile stretch of Interstate Highway IH-35E from IH-635 to US-380 (southern section). It includes reconstruction and extension to incorporate two toll lanes and one additional lane in each direction.
It includes various intersections, and the following aspects: development of study of alternatives, development plan, design of structures, drainage, traffic control study, traffic signalisation, economic control, etcetera.
Location Dallas, Texas, United States
Date: 2012
Budget: 2.000.000.000 US$
Scope of the project: IH-35E interstate bidding project