Logo Proes
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES

5

Proyecto básico de plataforma de la línea de alta velocidad Vitoria-Bilbao-San Sebastián, tramo Atxondo-Abadiño

Basic platform design for the Vitoria-Bilbao-San Sebastián high-speed railway line, Atxondo-Abadiño section.

53.350.000 € PEM 1.755 m length Arrazola viaduct The Atxondo-Abadiño section is 5,66 km long and runs entirely along the

READ MORE »
Proyecto y asistencia técnica del nuevo rack de tuberías en el pantalán Reina Sofía del puerto de Huelva

Project and technical assistance for the new pipe rack on the Reina Sofia pontoon in the port of Huelva

Debido al aumento de la demanda en la operación de nuevos productos por vía marítima, surge la necesidad de ampliación del rack de tuberías del

READ MORE »
Proyecto variante para la prolongación del dique de Poniente del puerto de Almería

Project for the extension of the Poniente breakwater in the port of Almeria

18.523.000 € PEM  416,10 m longitud primer tramo La Autoridad Portuaria de Almería acomete el desarrollo de poniente del puerto con vistas a dotarlo de

READ MORE »
Emisario submarino de la EDAR de Lagares, Vigo

Submarine outfall of the Lagares WWTP, Vigo

2,090 m length 2,000 mm outer diameter The works consist of the construction of an outfall that has two sections: the land section with a length of

READ MORE »
Proyecto constructivo del emisario submarino de Xagó, Asturias

Construction project for the submarine outfall at Xagó, Asturias

14.560.000 PEM 2.588 m length submarine outfall This is the constructive design of a submarine outfall in Xagó, Asturias, for the drainage of the estuary.

READ MORE »
Plan director de infraestructuras de la Autoridad Portuaria de la Bahía de Algeciras

Infrastructure Master Plan of the Port Authority of the Bay of Algeciras

315.000 pasajeros  380.000 Teu anuales de contenedores El objetivo del proyecto es la redacción del Plan Director de Infraestructuras de la Autoridad Portuaria de la

READ MORE »
Inspección y evaluación estructural de un muelle-dique en Salinetas, Gran Canaria

Structural inspection and assessment of a dock-dock in Salinetas, Gran Canaria

2.940.000 € PEM 50 years old The Disa hydrocarbon plant dock-dock is at the end of its useful life, and presents

READ MORE »
Evaluación de la demanda de servicios portuarios para la terminal de contenedores de TTIA, Algeciras

Assessment of the demand for port services for the TTIA container terminal, Algeciras

57.621 m2 área de atraque 300.119 m2 patio La Autoridad Portuaria de la Bahía de Algeciras (APBA) contrata a Proes como asistencia técnica para llevar

READ MORE »
Proyecto básico de prolongación del espigón de El Tarajal en Ceuta

Basic project for the extension of the breakwater at El Tarajal in Ceuta

42 m longitud de la estructura  El proyecto consiste en el diseño de una estructura proyectada para ampliar el espigón del Tarajal, que actúa de

READ MORE »
Plan de emergencia interior del puerto de San Ciprián, Lugo

Inland emergency plan for the port of San Ciprián, Lugo

6,000,000 t annual cargo volume of the port The aim of the Internal Emergency or Self-Protection Plan is to establish the foreseen organisational and functional framework.

READ MORE »

Home

Calle Virgilio, 2, edificio 3
28223 Pozuelo de Alarcón, Madrid

913 454 565

  • Disclaimer
  • Privacy policy
  • Cookies Policy
  • Management policies
  • Complaints channel

© Proes 2025. All rights reserved