Silvertown Tunnel under river Thames for Riverlinx

1,4 km 

road tunnel

1.554,5 M€

of investment

The Silvertown Tunnel will be a new 1.4-kilometer, two-lane road tunnel under the River Thames, connecting North Greenwich and Silvertown.

The works include, among other things, the design of temporary structures, the design of the construction plan and sequence, monitoring the impact of tunnel boring machines, and supporting the project team in obtaining authorizations and permits.

 

Location London, UK 

Date: 2020-2023

Scope of the project: temporary structures project, construction project, supervision, and permit acquisition

Other projects

20,725.760 m platform 350 km/h V max This is the Consultancy and Technical Assistance for the Control of the Construction Project Works.

27.046.000 € PEM 17,7 km length The Anillo Verde Ciclista de Madrid is a circuit whose objective is to connect several parks and green areas of

1.586.000 € PEM The work consists of doubling the access bridge to the industrial estate, separating incoming and outgoing traffic from the road.